I-35W Maintenance of Traffic

Hennepin County, MN

Project Overview


This project was part of a larger initiative by MnDOT to reconstruct and enhance I-35W from 36th Street to I-94 in Minneapolis, with diverse objectives including added lanes, pavement and bridge preservation, construction of the Lake Street Transit Station, and improved bicycle and pedestrian access.

Our Work

Isthmus was tasked with developing the maintenance of traffic (MOT) plan to support the roadway reconstruction project on I-35W, one of the key arteries feeding into and out of downtown Minneapolis. Temporary alignments were defined and preliminary models constructed for all five phases of the construction with subgrade, earthwork quantification, retaining walls, noise walls, ramps, intersections, driveways, and barriers included.

Our team led the design of the 30+ detour routes on the project. This included local and regional detours to aid the traveling public while certain sections of the project were under reconstruction. The detours included both vehicular and pedestrian routes. Special sign panels were created utilizing SignCAD for guidance to travelers in certain areas where additional destination information was needed due to the detours.

Featured Team Members

Amber Nord
Role: Traffic Control, Detours Lead Engineer

Mike Zmuda
Role: Staging Alignment Engineer

Jason Tschida
Role: Staged Construction Modeling & Earthwork Engineer

Elizabeth Lewen
Role: Traffic Control, Detours Design Engineer

Featured Services

  • Traffic Engineering
  • Traffic Control
  • Maintenance of Traffic (MOT) Plans

 

Project Details

Owner: MnDOT Metro District

Location: Minneapolis, MN

Project Number: SP 2782-327