Skip to main content
This website uses a variety of cookies, which you consent to if you continue to use this site. You can read our Privacy Policy for details about how these cookies are used, and to grant or withdraw your consent for certain types of cookies.

Hwy 610 Design-Build

Hennepin County, MN
Project Overview

The project involved involved the construction of a new four-lane freeway in the City of Maple Grove, extending the Highway 610 corridor to the west from Highway 169 to Elm Creek Boulevard North.

Our Work

Isthmus was part of the design-build team that produced the roadway construction plans. Our team created 3D models and cross sections of the proposed surface that were successfully used for directing the grading equipment using machine control devices.

As part of the construction plans, we also designed noise walls to decrease noise levels and provide a visual screen from the highway for nearby homeowners and businesses.

Featured Team Members

Amy DeBruin
Role:
As-Built Plan Preparation Task Lead

Avo Toghramadjian
Role:
Design Quality Manager

Featured Services
  • 3D Modeling for Machine Control
  • Cross Section Development
  • Noise Wall Design
  • As-Built Plan Preparation
 
Project Details

Owner: MnDOT Metro District

Location: Hennepin County, MN

Project Number: SP 2771-38